The automated enameling liner production line at Zhongguang Electric's Smart Manufacturing Industrial Park (co-constructed by TIMS ) was officially commissioned
2025-06-10 08:32
The automated enameling liner production line at Zhongguang Electric's Smart Manufacturing Industrial Park (co-constructed by TIMS ) was officially commissioned
The automated enameling liner production line at Zhongguang Electric's Smart Manufacturing Industrial Park (co-constructed by TIMS ) was officially commissioned

The shipment of the automatic enamel coating production line for water heater liners

The line features: robot automatic loading after pre-welding, automatic sandblasting, inner/outer surface enameling, end cap enameling, drying, robot transfer to firing line, gas enameling firing, and robot unloading to post-welding line for air-source heat pump water heater liners.

Shipment and installation of the automated water heater liner enameling line for Galanz Group:

Shipped over three days (July 1921); expected to start operation in 3 months.

Features energy-efficient self-preheating WS burners with P-type radiant tubes (German imported Inconel 601 material) and waste heat utilization for low energy consumption.

news list
Recommended news
2025-06-03 14:01
TIMS Expands Its Horizons, co - create infinity
TIMS Expands Its Horizons, co - create infinity
2025-04-18 22:57
Shipment of High-End Coating Equipment Production Line to Mexico
Shipment of High-End Coating Equipment Production Line to Mexico
2025-04-18 23:14
The informationized air conditioning powder coating line undertaken by TIMS for a multinational group in Thailand has started shipment
The informationized air conditioning powder coating line undertaken by TIMS for a multinational group in Thailand has started shipment
2025-04-19 00:18
Salute to every woman
Salute to every woman
share to